Water tank wire drawing machine is called because there is a water tank filled with water within it. The water tank wire drawing machine is a small continuous production equipment composed of multiple drawing heads. By drawing step by step, the drawing heads are placed in the water tank, and finally the wire is pulled down to the required specifications. The working principle of water tank wire drawing machine is that after the wire passes through each stage of drawing in the machine, the diameter of the metal wire changes, so the working line speed of each drawing head should also change. Metal tech Water Tank Wire Drawing Machine is mainly suitable for the drawing of wire with small wire diameter less than 3 mm, and the minimum wire diameter can reach 0.1 mm.
Model | LT-12/350 | LT-17/280 | LT-19/200 |
Dia. Of Block | φ350mm | φ280mm | φ200mm |
Wire Drawing Mould | 12pcs | 17pcs | 19pcs |
Max. Dia. Of Inlet Wire | φ3.5mm | φ3.0mm | φ1.6mm |
Min. Dia. Of Outlet Wire | φ0.7mm | φ0.5mm | φ0.3mm |
Total Condensation | 86% | 90% | ~96% |
Average Condensation | 16% | 16% | 15.50% |
Speed Of Drawing | 250-400m/min | 250-400m/min | 400~700m/min |
Power Of Motor | 30-37.5kw | 18.5kw-22kw | 15-18.5kw |
Dimension | 2400×1100×1100mm | 6500×1800×1600mm | 2310×1440×1160mm |
Weight | 6000kg | 5000kg | 4000kg |
Metal tech Water Tank Wire Drawing Machine use high-quality material parts, strict quality management all these guarantee superior quality and long performance Water Tank Wire Drawing Machine life.
Delivery of Equipment: FOB China Port
Payment Terms: 40% By T/T in advance as down payment, 60% By T/T or Irrevocable Confirmed L/C at sight before Shipment
Delivery Time: Within 30-60 days after receipt of the down payment
Packing: with plastic film safety packing
Guarantee: 12 months after commissioning or 18months after shipment. Whichever first is in valid. (It is excluding wear parts. Shipping cost for parts to be replaced during warranty period has to be borne by the customer.)
Installation and Start-up: 1-2 technicians and 1 interpreter will be assigned to coordinate installation, commissioning and training, for the maximum duration of 15 working days, the buyer will supply the air return tickets, food, accommodation (hotel and one day three meals), transportation, communication, insurance, tax (if have) for the technicians and the interpreter. USD100.00/day/person working fee will be paid to them.
1.One set of every detail manual operation and maintenance
2.Installation and commissioning (point 7 in terms)
3.Training program (include training the factory operator and technical)
4.Installation and commissioning report with all the information which from the whole period